Tratamiento térmico

¡No permita que BMSB aplaste su cadena de suministro! El tiempo, la temperatura y la experiencia importan.

 Heat Treatment Guide: BMSB Season & Australian Quarantine Compliance
BMSB Season (Sept 1st - April 30th): Technical Requirements

Treatment Specifications

  • Initial temperature mapping required
  • Calibrated sensors (±0.5°C accuracy)

Technical Validation

  • Core Temperature: 56°C minimum
  • Holding Time: 30 minutes after core temp reached
  • Maximum Container Load: 70-80% capacity
  • Temperature Recording: Every 1 minutes minimum
  • Free Air Space: 20cm between goods for airflow

Operational Parameters

  • Pre-heating phase: 2-4 hours typical
  • Total treatment time: 4-6 hours average

Compliance Checks

  • Real-time monitoring systems
  • Automated failure alerts
  • Treatment certificates within 120 hours

Contacto

Created by: BigWeb